NewsPronto

 
The Times


.

News from Asia

Military Metals Reports Maiden Inferred Resource Estimate Containing 67,000 Tonnes of Antimony and 222,000 Ounces of Gold at Flagship Trojarova Project, Europe

  • Written by Media Outreach
Vancouver, British Columbia - Newsfile Corp. - April 8, 2026 - Military Metals Corp. (CSE: MILI) (OTCQB: MILIF) (FSE: QN90) (the "Company" or "MILI") is pleased to announce the completion of a maiden Inferred Mineral Resource estimate (MRE) of 6.5 Mt at 1.02% Sb and 1.06 g/t Au for 67 thousand tonnes (kt) of antimony and 222 thousand ounces (koz) of gold at the Company's wholly owned flagship Trojárová Project (the "Project") in Western Slovakia. Highlights:
  • Inferred Mineral Resource of 6.5 Mt at 1.02% Sb and 1.06 g/t Au for 67 kt of antimony and 222 koz of gold (Table 1)
  • Resource estimate incorporated 53 diamond drill holes totaling 7,167 m of drilling and 55 intervals of underground chip samples totaling 202 m
  • Historical MRE is now replaced by a modern MRE that is prepared in accordance with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards (CIM, 2014) and the CIM Best Practice Guidelines of Mineral Resources and Reserves (2019)
Scott Eldridge, Chief Executive Officer of the Company, commented, "The maiden mineral resource estimate of the Trojárová Project firmly underpins the value of Military Metals. Following our 2025 confirmation drilling campaign Trojárová has emerged as the largest antimony resource in the European union that is defined by a modern regulatory standard 1, and among the largest antimony resources globally. At a time when the need for secure, domestically sourced critical minerals is more pressing than ever, these results strengthen the project's potential importance to, and alignment with, the EU's objective of building a dependable, home-grown supply of critical raw materials." 1The Company defines "a modern regulatory standard" as NI 43-101, JORC, or S-K 1300 disclosure standards. Table 1 - Trojárová Mineral Resource Estimate - April 6, 2026
ClassificationTonnageAverage GradeContained Metal
(Mt)Sb (%)Au (g/t)Sb (kt)Au (koz)
Inferred 6.5 1.02 1.06 67 222
Notes:
  1. The Mineral Resource Estimate was completed by SLR Consulting (Canada) Ltd. ("SLR") in accordance with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards and the CIM Best Practice Guidelines of Mineral Resources and Reserves (2019).
  2. SLR is independent of Military Metals Corp.
  3. The Mineral Resource is reported on a 100% ownership basis.
  4. Mineral Resources are estimated at a cut-off grade of 0.8% SbEq.
  5. The formula for SbEq is SbEq = Sb % + (Au g/t * 0.562).
  6. Mineral Resources are estimated using a long-term antimony price of US$29,000 per tonne and a gold price of US$3,000 per ounce.
  7. A uniform bulk density of 2.82 t/m3 was applied based on the length-weighted mean from laboratory density determinations from the Project's main mineralized zone.
  8. Metallurgical recovery is 85% for antimony and 85% for gold.
  9. The Mineral Resource excludes a 50 m crown pillar.
  10. Resource estimation domains were modelled to a 2.0 m minimum width.
  11. Totals may vary due to rounding.
The 2026 Trojárová Mineral Resource Estimate The maiden Mineral Resource Estimate ("MRE") incorporates all historical and modern drilling completed on the project, as well as historical underground sampling, comprising 53 diamond drill holes totaling 7,167 m and 55 underground face chip sampling intervals totaling 202 m. Three historical drill holes without analytical results available were excluded. Six mineralization wireframes, each supported by a minimum of two drill holes, were manually built based on a 0.1% SbEq threshold. A minimum wireframe width of 2.0 m was applied to all zones. Mineral Resources above the 0.8% SbEq cut-off were reported in four of the six mineralization wireframes (Figure 1). Inferred Mineral Resources correspond to areas supported by at least two drill holes with nominal drill spacing of no more than 150 m. Classification boundaries were locally refined manually to reflect geological interpretation, grade continuity, and zone thickness. The MRE is constrained within estimation domains meeting a 2.0 m minimum mining width. A 50 m crown pillar was also excluded from the MRE. Resource classification follows the CIM (2014) Definition Standards. Modeling and estimation were completed in Leapfrog Geo and Leapfrog Edge, and validation included database checks, wireframe-to-block volume comparisons, statistical reviews, and visual inspections on sections, plans, and longitudinal sections. Reporting assumes an antimony price of US $29,000 per tonne and a gold price of US$3,000/oz, with an effective date of April 6th, 2026. The average grade, minimum mining width and other results or assumptions above do not guarantee future production. imageFigure 1: Trojárová deposit showing Inferred Mineral Resources above cut off (grey), and...

Read more: Military Metals Reports Maiden Inferred Resource Estimate Containing 67,000 Tonnes of Antimony and...